Week six has come to a close and the sheet rock and stucco lath have been installed. For those who don't know, the lath is a wire mesh, almost like chicken wire, that the stucco adheres to. Below is a picture of what it looks like on a house.
Friday, February 12, 2010
Tuesday, February 2, 2010
Week 5 - Los Altos San Luis Project
This week we will finish up the insulation of the walls and then begin putting up the sheet rock. Once all the sheet rock has been installed, it will be taped and textured. Below are some pictures of what the finished framing, plumbing, electrical, and mechanical look like. You will also notice that the glass block window and skylight have been installed.
Labels:
3. Los Altos - San Luis Project