Here are some interior shots of the house below.
Tuesday, September 8, 2009
The Los Altos Project Update
After a long intermission, we are finally back with a blog update. We have a couple projects that are on the home stretch so things are moving along rapidly. This update is for the Los Altos Project posted back in January, and already the images included are obsolete. Below shows the finished stucco and some interior shots with the sheetrock up. To date the exterior has been painted and the cabinets have been installed, but that will have to wait till the next post.
Front
Labels:
6. Los Altos Project
Wednesday, January 14, 2009
Los Altos Project
We are breaking ground (literally) on a new project in Los Altos. This is going to be a complete remodel. Right now we are demoing the back porch, to be followed shortly by the pool. Below is the proposed floor plan for the remodel, as well as some pics of what the house looks like currently.

Labels:
6. Los Altos Project
Tuesday, December 16, 2008
Campbell 2 Project
It's been awhile since our last update, and this current project is on the home stretch. The addition has been fully framed. Sheetrock has been added to the inside, and the stucco lath had been installed on the outside. The entire roof was also replaced. Check out the photos below to see how far it's come.
Before
After
Before
After
Labels:
5. Campbell 2 Project
Subscribe to:
Posts (Atom)







